{"id":953,"date":"2009-01-17T11:09:14","date_gmt":"2009-01-17T18:09:14","guid":{"rendered":"http:\/\/www.passthespanner.com\/?p=953"},"modified":"2009-09-18T11:10:57","modified_gmt":"2009-09-18T18:10:57","slug":"engine-cleanup","status":"publish","type":"post","link":"https:\/\/www.passthespanner.com\/?p=953","title":{"rendered":"Engine cleanup"},"content":{"rendered":"<p><span style=\"line-height: 16px; font-size: 12px;\">While the heads are dissasembled and ready to be sent off to be machined.<\/span><\/p>\n<p style=\"font-size: 12px; line-height: 16px;\">The engine compartment is cleaned up and the body is ready to be sent over to get final body work and paint.<\/p>\n<p style=\"font-size: 12px; line-height: 16px;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-954\" title=\"IMG_4002\" src=\"http:\/\/www.passthespanner.com\/wp-content\/uploads\/2009\/09\/IMG_4002.jpg\" alt=\"IMG_4002\" width=\"400\" height=\"300\" srcset=\"https:\/\/www.passthespanner.com\/wp-content\/uploads\/2009\/09\/IMG_4002.jpg 400w, https:\/\/www.passthespanner.com\/wp-content\/uploads\/2009\/09\/IMG_4002-300x225.jpg 300w\" sizes=\"auto, (max-width: 400px) 100vw, 400px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-955\" title=\"IMG_4003\" src=\"http:\/\/www.passthespanner.com\/wp-content\/uploads\/2009\/09\/IMG_4003.jpg\" alt=\"IMG_4003\" width=\"400\" height=\"300\" srcset=\"https:\/\/www.passthespanner.com\/wp-content\/uploads\/2009\/09\/IMG_4003.jpg 400w, https:\/\/www.passthespanner.com\/wp-content\/uploads\/2009\/09\/IMG_4003-300x225.jpg 300w\" sizes=\"auto, (max-width: 400px) 100vw, 400px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-956\" title=\"IMG_4007\" src=\"http:\/\/www.passthespanner.com\/wp-content\/uploads\/2009\/09\/IMG_4007.jpg\" alt=\"IMG_4007\" width=\"400\" height=\"300\" srcset=\"https:\/\/www.passthespanner.com\/wp-content\/uploads\/2009\/09\/IMG_4007.jpg 400w, https:\/\/www.passthespanner.com\/wp-content\/uploads\/2009\/09\/IMG_4007-300x225.jpg 300w\" sizes=\"auto, (max-width: 400px) 100vw, 400px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>While the heads are dissasembled and ready to be sent off to be machined. The engine compartment is cleaned up and the body is ready to be sent over to get final body work and paint.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[],"class_list":["post-953","post","type-post","status-publish","format-standard","hentry","category-1971-jaguar-v12-e-type"],"_links":{"self":[{"href":"https:\/\/www.passthespanner.com\/index.php?rest_route=\/wp\/v2\/posts\/953","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.passthespanner.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.passthespanner.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.passthespanner.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.passthespanner.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=953"}],"version-history":[{"count":2,"href":"https:\/\/www.passthespanner.com\/index.php?rest_route=\/wp\/v2\/posts\/953\/revisions"}],"predecessor-version":[{"id":958,"href":"https:\/\/www.passthespanner.com\/index.php?rest_route=\/wp\/v2\/posts\/953\/revisions\/958"}],"wp:attachment":[{"href":"https:\/\/www.passthespanner.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=953"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.passthespanner.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=953"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.passthespanner.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=953"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}